BT6-B Sanitary Balanced Pressure Thermostatic Steam Trap

Clean steam products

BT6-B Sanitary Balanced Pressure Thermostatic Steam Trap

The Spirax Sarco BT6-B is a sanitary balanced pressure thermostatic steam trap for clean and pure steam, with a crevice-free 316L body, self-draining geometry, near-saturation operation and BL/BH capacity options.

Genuine Spirax Sarco industrial steam product Engineered for energy efficiency and system safety Backed by worldwide application engineering support

Quick facts

Model / CodeBT6-B
CategoryClean steam products
ManufacturerSpirax Sarco

BT6-B sanitary balanced pressure thermostatic steam trap

Spirax Sarco BT6-B is a sanitary balanced pressure thermostatic steam trap for clean, chemical-free and pure steam services. It is designed for condensate removal where cleanability, drainability and low condensate retention are part of the process requirement, not just an energy-efficiency preference. The documented application range includes clean steam mains drainage, sterile steam barriers, block-and-bleed arrangements, steam filter housings, sterilisers, autoclaves, bioreactors and CIP/SIP duties on vessels, reactors and process lines.

In a hygienic utility, a trap has to discharge condensate without creating unnecessary hold-up points. Stagnant liquid can make drainage less predictable and can work against cleaning, sterilisation and repeatable process conditions. The BT6-B platform combines a crevice-free 316L body, a self-draining geometry and a temperature-sensitive balanced-pressure element so the trap can manage cold start-up fluid while closing close to steam saturation temperature during normal operation.

Why Spirax Sarco BT6-B is suited to clean steam drainage

The body incorporates a 15-degree angled seat toward the orifice. This steep angle is intended to support full drainability and reduce areas where condensate or cleaning fluid can remain after the line has drained. The wetted construction is based on 316L stainless steel, while the standard safety clamp is 316 stainless steel. A PTFE and 316L stainless-steel composite gasket is listed in the current technical information. These details give the product a defined hygienic boundary that can be checked against the material, surface-finish and validation requirements of the complete system.

Each trap is individually packaged in an ISO Class 7 clean environment with protective end caps and a sealed protective bag. This packaging statement belongs to the supplied product and should not be confused with a claim that the installed pipework is automatically a cleanroom installation. The final project specification still needs to define cleaning, passivation, material traceability and any certificates required at order level.

Balanced-pressure thermostatic operation

During cold and start-up conditions, the stainless-steel capsule is open. It can therefore discharge air, condensate and, where the system is designed for it, CIP fluid before the line reaches steam temperature. As the temperature approaches saturation, the fluid inside the capsule expands and the valve closes near steam temperature. This operating sequence supports air removal during start-up, condensate drainage during heat-up and reduced live-steam loss once steam reaches the trap.

The standard element is designed to open within 2 °C (4 °F) nominal sub-cooling of steam saturation temperature at 50 mm (2 inch) above the trap and at pressures below 2.4 bar g (35 psi g) in typical operating conditions. This is a conditional performance statement rather than an unconditional set-point: operating pressure, installation arrangement and ambient conditions affect the actual result. The cooling leg should be designed around the real process duty and layout, even though near-saturation operation can allow a shorter cooling leg than a trap that discharges substantially below steam temperature.

BT6-BL and BT6-BH capacity choices

The BT6-B family is documented in two capacity types: BT6-BL low capacity and BT6-BH high capacity. The low-capacity type is intended for lower condensate loads such as many main-drainage points, while the high-capacity type is available where condensate or cold-water loads are higher and where start-up or CIP/SIP drainage requires more capacity. A selection should be based on the condensate load, start-up case and differential pressure at the trap, not on nominal connection size alone.

The official capacity chart contains separate BL and BH curve groups for cold-water and hot-water capacity. Read the curve that matches the selected type, size and differential pressure, and account for return-line backpressure and the condition of the fluid being discharged. For Spirax Sarco BT6-B enquiries, the required capacity type should be stated together with the pipe connection and the operating data so that a low-capacity and high-capacity configuration are not treated as interchangeable.

Hygienic construction, finish and connection options

The technical information lists internal surfaces with a finish of 0.6 micrometre Ra and external surfaces with 1.0 micrometre Ra, measured to ISO 4287-1997 and ISO 4288-1997. Mechanical and electropolishing to 0.375 micrometre Ra is available as an option. A fixed bleed can also be specified for fail-open operation. These are configuration and order requirements, so the required surface finish, bleed arrangement and documentation should be recorded before the purchase order is released.

Connection families include sanitary clamp-ended variants to ASME BPE, ISO 1127 and DIN 32676 standards, as well as tube-ended variants to DIN 11866, DIN 11850 and ISO 1127. The source lists sizes from small sanitary connections through 1 1/2 inch or DN40 groups, but the exact combination of type, size and market availability must be confirmed against the Spirax Sarco SSP list. The Food+ range is specifically listed with ASME BPE connections; food-contact declarations and the applicable CIP cycle must be confirmed for the complete ordered configuration.

Pressure, temperature and material checks

The body design condition is PN10. The technical limits state a maximum allowable pressure of 10 bar g at 140 °C and a maximum allowable temperature of 177 °C at 9.2 bar g. For saturated steam service, the maximum operating pressure is 6 bar g and the maximum operating temperature is 165 °C at 6 bar g. The minimum allowable temperature is -10 °C, the minimum operating temperature is 0 °C and the product is documented as suitable for full vacuum conditions. The 15 bar g value is a maximum cold hydraulic test pressure, not a normal operating rating.

Pressure and temperature must be evaluated together using the source envelope. Sanitary clamps and gaskets may impose lower limits than the body, and local regulations may further restrict use. The pressure/temperature chart, the selected connection, the condensate return pressure and any cleaning cycle must all be checked before a Spirax Sarco BT6-B configuration is approved. Seal, material, surface-finish and certification statements should likewise be treated as ordered options or documented compliance statements, not as permission to ignore the limits of the installed system.

Applications and selection boundaries

Typical duties include drainage from clean steam mains, sterile barriers, block-and-bleed systems, filter housings, sterilisers and autoclaves, bioreactor sterilisation and hygienic process equipment. The trap is one part of the utility arrangement: the upstream steam quality, line slope, isolation, pressure protection, air removal, discharge routing and condensate return design remain system responsibilities. A BT6-B selection should not be used to compensate for poor pipe drainage or an incorrectly sized return line.

For broader steam-trap operating principles and selection questions, use the steam trap selection guide. When the same clean-steam line needs dedicated removal of air and other non-condensable gases, the AVM7 hygienic air vent is a complementary route to review. If filtration of a steam filter housing is part of the same design, compare the CSF16 clean steam filter. Where maintainability and a different clean-steam trap construction are the selection priority, compare the BTM7 clean steam trap. These links address adjacent information tasks; this page remains focused on the BT6-B sanitary trap platform.

Installation, commissioning and maintenance planning

The BT6-B is designed for installation in a vertical line with flow downwards so that the body can self-drain. Check the flow arrow and include a suitable cooling leg to avoid condensate backing up into process equipment under normal conditions. Do not expose the capsule to superheat. Fittings and pipe clamps for the pipe-end connections are not supplied, so the connection standard and gasket/clamp combination need to be specified separately. If discharge is to atmosphere, route it to a safe location because the discharged fluid may be at approximately 100 °C.

Before commissioning, verify the nameplate, intended fluid, materials, pressure and temperature limits, connection orientation and the selected capacity type. Build pressure slowly and test alarms or protective devices after installation or maintenance. For service, isolate both supply and return, vent pressure gradually and allow the assembly to cool to 60 °C or below before removing the body clamp. Use a new seal during reassembly, position the valve head to close on the seat orifice, tighten the sanitary clamps and check for leaks. Available spares are the capsule element assembly, seal and outlet body including the seat; state the size and BL/BH type when ordering.

BT6-B enquiry checklist

  • Confirm clean, chemical-free or pure steam service and whether the duty includes SIP, CIP, sterile barriers or food-contact service.
  • Calculate condensate and cold-water loads for start-up and normal operation, then choose the BL or BH capacity curve at the available differential pressure.
  • Specify the sanitary clamp or tube-ended standard, size, gasket and clamp restrictions, required surface finish and any fixed-bleed option.
  • Check the complete pressure/temperature envelope, return-line backpressure, cooling-leg layout, safe discharge route and superheat exposure.
  • State material traceability, passivation, Food+ declarations, FDA/USP documentation or other inspection requirements at order placement where applicable.

For a Spirax Sarco BT6-B selection, keeping the operating data with the capacity type, connection standard and finish requirement gives the design and maintenance teams a clear record of what was actually specified. It also prevents a family-level product name from hiding the practical differences between the BL and BH configurations.

Description and capacity types

The BT6-B is a sanitary balanced pressure thermostatic steam trap family designed to remove condensate from clean, chemical-free and pure steam applications with minimal condensate retention. The source sheet identifies two capacity types: BT6-BL low capacity and BT6-BH high capacity.

Documented applications include sterile steam barriers, block-and-bleed installations, steam main drainage, and CIP/SIP of vessels, reactors and process lines. The product is manufactured with a crevice-free 316L body design and a 15-degree angled seat to support full drainability.

The standard element is designed to open within 2 °C (4 °F) nominal sub-cooling of steam saturation temperature at 50 mm (2 inch) above the trap and at pressures below 2.4 bar g (35 psi g) in typical operating conditions. Actual operating performance may be affected by operating pressure, installation and ambient conditions. Select the BL or BH capacity type from the actual condensate and cold-water load, differential pressure and start-up conditions.

Options and surface finish

  • Internal surfaces: 0.6 micrometre Ra (25 micro-inch Ra, ASME BPE SF2).
  • External surfaces: 1.0 micrometre Ra (40 micro-inch Ra).
  • Mechanical and electropolishing to 0.375 micrometre Ra (15 micro-inch Ra, ASME BPE SF4).
  • Fixed bleed for fail-open operation.

The body surface finish is measured to ISO 4287-1997 and ISO 4288-1997. Each trap is individually packaged in an ISO Class 7 clean environment with protective end caps and a sealed protective plastic bag.

BT6-B sanitary steam trap exploded construction drawing showing the inlet body, outlet body, capsule element, safety clamp and seal
Construction drawing from TI-P180-30. Numbered components are identified in the materials table; the selected BL or BH capsule type must be stated when ordering.

Standards, compliance and certification

The source sheet states that the BT6-B design is built in general accordance with ASME BPE and complies with the European Pressure Equipment Directive 2014/68/EU. For the Food+ range covered by the source, it also states compliance with EC1935:2004 for food-contact materials and EC2023:2006 on good manufacturing practice for materials and articles intended to come into contact with food. Seal material documentation refers to FDA CFR Title 21 paragraph 177.1550, USP Class VI biological reactivity testing in vitro <87> and in vivo <88> at 121 °C (250 °F) for one hour, ADI-free materials and processes, TSE/BSE-free certification, and full material lot traceability.

Available certification and inspection documents include EN 10204 3.1 full validation pack, pressure-retaining-parts material certification, wetted-parts material certification for element spares, specific or typical internal surface finish records, FDA/USP/ADI statements, a TSE-BSE statement, Food+ declaration of compliance where applicable, a BS EN ISO 14644-1:2015 Class 7 clean-room declaration, passivation certificate and typical test report. Requirements must be stated at order placement and some are chargeable.

Sizes and pipe connections

The following source matrix covers sanitary clamp-ended and tube-ended connection families. It is a standards and size reference, not a promise that every combination is available in every market. Consult the SSP list and confirm the final connection with the order.

Connection familyStandardIssueType or seriesSizes listed in source
Sanitary clamp-ended variantsASME BPE-Type A1/2 inch, 3/4 inch
ASME BPE-Type B1 inch, 1 1/2 inch
ISO 11271997Series 1DN25, DN40
ISO 11271997VariationsDN15, DN20
DIN 326762001-02Series 2DN15, DN20, DN25, DN40
DIN 326762009-05Series ADN15, DN20, DN25, DN40
DIN 326762009-05Series BDN8, DN10, DN15, DN20, DN25, DN32, DN40
DIN 326762009-05Series C1/2 inch, 3/4 inch, 1 inch, 1 1/2 inch
Tube-ended variantsDIN 118662016-11Series ADN15, DN20, DN25, DN40
DIN 118501999-01Series 2DN15, DN20, DN25, DN40
ISO 11271997Series 1DN15, DN20, DN25, DN40

The Food+ range is listed as available with ASME BPE connections. For other connection requirements, consult Spirax Sarco.

Materials

No.PartMaterial
1Body, inletStainless steel, 316L (1.4404)
2Body, outletStainless steel, 316L (1.4404)
3Capsule elementStainless steel, 316L (1.4404)
4Safety clampStainless steel, 316 (1.4401)
5SealPTFE and 316L (1.4404) stainless-steel composite gasket

Pressure/temperature limits (ISO 6552)

BT6-B pressure and temperature envelope showing the steam saturation curve and prohibited shaded regions
Read pressure and temperature together. The shaded regions are outside the permitted envelope.

For hygienic or sanitary clamp ends, the maximum pressure and temperature may be restricted by the gasket or sanitary clamp used. Consult the final connection specification.

Body design conditionPN10
PMA maximum allowable pressure10 bar g @ 140 °C (145 psi g @ 284 °F)
TMA maximum allowable temperature177 °C @ 9.2 bar g (351 °F @ 139 psi g)
Minimum allowable temperature-10 °C (14 °F)
PMO maximum operating pressure for saturated steam6 bar g (87 psi g)
TMO maximum operating temperature165 °C @ 6 bar g (329 °F @ 87 psi g)
Minimum operating temperature0 °C (32 °F)
Vacuum serviceSuitable for use under full vacuum conditions
Maximum cold hydraulic test pressure15 bar g (218 psi g)

The hydraulic test value is a test pressure, not an operating rating. Follow IM-P180-31 for the required removal of internals and gasket substitution before hydraulic testing.

Capacity chart (in accordance with ISO 7842)

The chart below is the official source graph for condensate, cold-water and hot-water capacity against differential pressure. It contains separate BL low-capacity and BH high-capacity curve groups. Read the curve that matches the selected capacity type, size, differential pressure and condensate condition; do not treat a nominal connection as a capacity value.

BT6-B capacity chart showing BL and BH cold-water and hot-water curves against differential pressure
BT6-B capacity source graph from TI-P180-30. Use the BL or BH curve group that matches the ordered capacity type.
Chart markerSize association shown by the source
ADN25 (1 inch), DN32 and DN40 (1 1/2 inch)
BDN20 (3/4 inch)
CDN8, DN10 and DN15 (1/2 inch)
DDN25 (1 inch), DN32 and DN40 (1 1/2 inch)
EDN20 (3/4 inch)
FDN8, DN10, DN15 (1/2 inch), DN20 (3/4 inch), DN25 (1 inch), DN32 and DN40 (1 1/2 inch)
GDN8-BL, DN10-BL, DN15-BL (1/2 inch), DN20-BL (3/4 inch), DN25-BL (1 inch), DN32-BL, DN40-BL (1 1/2 inch), plus DN8-BH, DN10-BH and DN15-BH (1/2 inch) groups shown in the source chart.

Approximate dimensions

BT6-B dimensional drawings for sanitary clamp-ended and tube-ended variants with dimensions A to E
Dimensions are approximate and shown in millimetres with inch equivalents in the source sheet.
Connection familySizes or standard groupABCDEWeight
Sanitary clamp-endedASME BPE Types A and B, ISO 1127, DIN 32676 Series 2, A and C variants65 mm (2.6 inch)64 mm (2.5 inch)71.5 mm (2.8 inch)77 mm (3 inch)61 mm (2.4 inch)1 kg (2.2 lb) maximum
Sanitary clamp-endedDIN 32676 Series B65 mm (2.6 inch)64 mm (2.5 inch)71.5 mm (2.8 inch)77 mm (3 inch)61 mm (2.4 inch)1 kg (2.2 lb) maximum
Tube-endedDIN 11866 Series A, DIN 11850 Series 2, ISO 1127 Series 192 mm (3.6 inch)64 mm (2.5 inch)71.5 mm (2.8 inch)77 mm (3 inch)61 mm (2.4 inch)1 kg (2.2 lb) maximum

Installation note and operation

For self-draining operation, the trap is designed to be installed in a vertical line with flow downward. Check the flow arrow on the body. Installation should include a suitable cooling leg to avoid condensate backup into process equipment under normal operating conditions. Do not expose the capsule element to superheat conditions, and handle all components carefully to avoid damaging the machined surfaces.

The stainless-steel capsule is filled with a WFI temperature-sensing fluid. During cold or start-up conditions it is fully open, allowing large volumes of air, condensate and/or CIP fluid to drain. As the system approaches steam temperature, the fill fluid expands and the valve closes the trap near steam temperature to reduce live-steam loss while maintaining efficient drainage.

Ordering example

Example wording from the source: one 1/2 inch BT6-BH sanitary balanced pressure thermostatic steam trap with a self-draining body, sanitary clamp ends to meet ASME BPE requirements, suitable for pressure up to 6 bar g, internal surface electropolished to 0.375 micrometre Ra (15 micro-inch Ra, ASME BPE SF4), and material certification to EN 10204 3.1 for pressure-containing parts. The order must state whether the BL or BH capacity type is required.

State the size, connection standard, pressure and temperature duty, required finish, certification and any fixed-bleed or Food+ documentation requirement at order placement. The separate installation and maintenance instructions contain the full safety, commissioning and service procedure.

Installation and Maintenance Guide

  1. Safety information
  2. General product information
  3. Installation
  4. Commissioning
  5. Operation
  6. Spare parts and maintenance
  7. Disposal and returns

These instructions apply to the BT6-B sanitary trap family. The technical information identifies the available capacity types as BT6-BL low capacity and BT6-BH high capacity; confirm the ordered type before installation or maintenance.

1. Safety information

Safe operation can only be guaranteed when the product is installed, commissioned, used and maintained by qualified personnel in compliance with the operating instructions. General pipeline and plant-construction safety rules, suitable tools and safety equipment also apply.

1.1 Intended use

Check these instructions, the nameplate and TI-P180-30 to confirm suitability for the intended application. The source document identifies the product as designed for steam, air or water/condensate in Group 2 of the European Pressure Equipment Directive. Contact Spirax Sarco before considering another fluid.

Check material compatibility, maximum and minimum pressure and temperature, and the consequences of malfunction. If the product limits are lower than the system limits, provide a safety device to prevent overpressure or overtemperature.

1.2 Access and lighting

Provide safe access and, where necessary, a guarded working platform before work starts. Arrange suitable lifting equipment if required and provide adequate lighting for detailed work.

1.3 Pipeline contents and surroundings

Consider what is in the pipeline, what may previously have been in it, flammable or hazardous substances, extreme temperatures, explosion-risk areas, lack of oxygen, dangerous gases, hot surfaces, fire hazards, excessive noise and moving machinery.

1.4 The complete system

Consider whether isolation or electrical isolation could put another part of the system or personnel at risk. Do not make vents, protective devices, controls or alarms ineffective. Operate isolation valves gradually to avoid system shocks.

1.5 Pressure and temperature

Isolate pressure and vent it safely to atmosphere. Consider double isolation, double block and bleed, and locking or labelling closed valves. A gauge reading of zero does not prove that the system is depressurised. Allow temperature to normalise after isolation to avoid burns.

If conditional Viton parts have seen approximately 315 °C or more, hydrofluoric acid may form. If PTFE parts have seen approximately 260 °C or more, toxic fumes may be released. Follow the source safety instructions, enforce the stated no-smoking rule for PTFE handling and prevent contact or inhalation hazards.

1.6 Tools, clothing and permits

Have suitable tools and consumables ready and use genuine replacement parts. Assess the need for protective clothing for chemicals, temperature, radiation, noise, falling objects and eye or face hazards. Work must be carried out or supervised by a competent person, with the site permit-to-work system followed.

1.7 Handling, residual heat and freezing

Assess manual-handling risks and use an appropriate method. The external surface may be very hot and can exceed 177 °C at maximum permitted conditions. Take care when removing the trap. Protect non-self-draining systems from frost damage where freezing temperatures are possible.

For Food+ food-contact systems, the source instructions require an appropriate CIP cycle before first use to minimise the risk of non-intentionally added substances. Confirm the relevant declaration and complete process qualification for the installation.

2. General product information

The BT6-B is a sanitary balanced pressure thermostatic steam trap family with BT6-BL low-capacity and BT6-BH high-capacity types. It removes condensate from clean chemical-free and pure steam applications with minimal condensate retention. Applications include sterile steam barriers, block-and-bleed installations, steam main drainage and CIP/SIP of vessels, reactors and process lines.

The crevice-free 316L body includes a 15-degree angled seat for full drainability. The standard temperature-sensitive capsule is designed to open within 2 °C nominal sub-cooling of steam saturation temperature at 50 mm above the trap and below 2.4 bar g in typical conditions. Actual performance depends on operating pressure, installation and ambient conditions.

Options include a fixed bleed for fail-open operation and mechanical/electropolishing to 0.375 micrometre Ra. Surface, material, connection, certification and Food+ requirements must be confirmed against the ordered configuration.

2.1 Pre-installation pressure and temperature check

ConditionSource limit
Body design conditionPN10
Maximum allowable pressure10 bar g at 140 °C
Maximum allowable temperature177 °C at 9.2 bar g
Minimum allowable temperature-10 °C
Maximum operating pressure for saturated steam6 bar g
Maximum operating temperature165 °C at 6 bar g
Minimum operating temperature0 °C
Hydraulic test pressure15 bar g maximum cold test pressure; follow Section 3.5

Sanitary clamps or gaskets may restrict the maximum pressure and temperature. The product is documented as suitable for full vacuum conditions, but the actual connection and system must still be checked.

2.2 Sizes and pipe connections

Connection familyStandard / issueType or seriesSizes listed
Sanitary clamp-ended variantsASME BPEType A1/2 inch, 3/4 inch
ASME BPEType B1 inch, 1 1/2 inch
ISO 1127 / 1997Series 1DN25, DN40
ISO 1127 / 1997VariationsDN15, DN20
DIN 32676 / 2001-02Series 2DN15, DN20, DN25, DN40
DIN 32676 / 2009-05Series ADN15, DN20, DN25, DN40
DIN 32676 / 2009-05Series BDN8, DN10, DN15, DN20, DN25, DN32, DN40
DIN 32676 / 2009-05Series C1/2 inch, 3/4 inch, 1 inch, 1 1/2 inch
Tube-ended variantsDIN 11866 / 2016-11Series ADN15, DN20, DN25, DN40
DIN 11850 / 1999-01Series 2DN15, DN20, DN25, DN40
ISO 1127 / 1997Series 1DN15, DN20, DN25, DN40

Consult the SSP list for available types and confirm the final connection, size, clamp and gasket before installation. Fittings, clamps and gaskets for pipe-end connections are not supplied.

3. Installation

Before installation, observe all safety information in Section 1. Refer to the nameplate and TI-P180-30 and confirm material suitability, pressure and temperature limits, installation situation and direction of fluid flow.

  1. Prepare the connections. Remove protective covers from connections and protective film from nameplates where appropriate before high-temperature service.
  2. Set the direction. The BT6-B is designed for a vertical line with flow downward so the body can self-drain. Check the flow arrow on the body. Do not expose the capsule element to superheat.
  3. Provide condensate drainage space. Include a suitable cooling leg to avoid condensate backup into process equipment under normal operating conditions.
  4. Fit the sanitary clamp. Handle the body and element carefully so machined surfaces are not damaged. Do not overtighten the clamp: take up slack and tighten the nut by no more than half a turn maximum, as overtightening may spread or extrude the seal into the element frame.
  5. Prepare for hydraulic testing. For the maximum 15 bar g cold hydraulic test, remove the internals and substitute the standard gasket with a Viton gasket. When swapping the gasket or removing internals, retighten the clamp to 50 lbf-in (5.65 N m) as specified in the source instructions.
  6. Route discharge safely. If the trap discharges to atmosphere, route it to a safe place; the discharged fluid may be at 100 °C (212 °F).

The installer remains responsible for minimising external pipe stresses and for providing safe access, lighting, handling arrangements and personal protection.

4. Commissioning

After installation or maintenance, confirm that the system is fully functioning and test alarms or protective devices. Build pressure slowly, as rapid pressurisation can damage sensitive equipment.

5. Operation

The operating element is a stainless-steel capsule filled with WFI temperature-sensing fluid. During cold or start-up conditions the capsule is fully open and allows air, condensate and/or CIP fluid to drain. As the system approaches steam temperature, the fill fluid expands and the valve closes the trap near steam temperature to prevent live-steam loss while maintaining efficient system drainage.

6. Spare parts and maintenance

6.1 Available spare parts

The source drawing shows available spares in solid outline. Parts drawn in grey are not supplied as spares.

SpareDrawing reference
Capsule element assembly3 and 5
Seal5
Body outlet including seat2

Order spares using the description in the source list and state the size and capacity type of trap. Example: one capsule element assembly for a 1/2 inch BT6-BH sanitary balanced pressure thermostatic steam trap.

6.2 Maintenance procedure

  1. Isolate the supply and return lines, allow pressure to normalise slowly to atmosphere and let the assembly cool.
  2. Do not remove the body clamp until the trap has cooled to 60 °C or below; damage to the capsule element assembly can occur above this temperature.
  3. Remove the sanitary clamps from the pipeline and remove the whole trap from the pipeline.
  4. Remove the body sanitary clamp. Remove the inlet and outlet body including the seat, seal and capsule element assembly for cleaning or replacement.
  5. Reassemble with a new seal and the valve head positioned to close onto the seat orifice. Replace and tighten the sanitary clamps.
  6. Return the trap to service, check for leaks and retighten as necessary.
BT6-B sanitary steam trap maintenance exploded drawing showing the capsule assembly, seal, outlet body and safety clamp
IM-P180-31 Fig. 2. The drawing identifies the maintenance components; the safety clamp is shown as not an available spare.

On occasions the gasket may bond to the metal parts. Do not pull or lever the welded capsule. Gently prise the gasket from the valve body as shown in the source maintenance sequence, then reassemble with a new seal.

7. Disposal and returns

Unless otherwise stated, the product is recyclable and no ecological hazard is anticipated when it is disposed of with due care and in accordance with local regulations. PTFE waste must be kept separate and disposed of by an approved method, not incinerated. Follow the current product-compliance information and local requirements.

When returning a product, provide written information about contamination residues, mechanical damage, hazards and the precautions required, including relevant safety data for hazardous substances.

Technical information

DocumentReferenceLanguageDownload
BT6-B洁净型TI-P180-30-ZHChineseDownload

Continue your hygienic trap selection

In hygienic steam systems, trap selection affects cleanability and condensate handling as much as it affects simple drainage performance.

Talk to our technical team

Contact Spirax Sarco for product selection, documentation or replacement guidance.